BDDKG / TIMING & CONTROL

Time Relays

Put the right delay into your control sequence. Compare time relay functions for machine sequencing, ventilation run-on and repeat-cycle control, then define the electrical and timing requirements for your project.

Discuss your time relay requirements
Three generic DIN-rail time relay concepts with blue adjustment dials

Function first

Define what starts timing and when the output must change. A familiar dial or similar housing does not mean two time relays have the same operating sequence.

Supply & signal

Match the supply voltage, AC or DC input and trigger arrangement to your control circuit. Keep supply terminals and control inputs distinct during selection.

Output & load

Check contact arrangement and the rating for the actual load. A headline resistive current rating alone cannot establish suitability for a contactor coil, motor or LED driver.

A controlled delay between an event and an action

A time relay changes an output according to a defined timing function after power or a control signal is applied or removed. It lets you introduce a repeatable delay into a control circuit without assigning a full programmable controller to a simple timing task.

Your selection starts with the sequence, rather than a preferred time range. Describe the input event, the required output state during the delay and the reset behavior. That description makes it easier to compare otherwise similar-looking devices and avoid replacing a timer with an electrically compatible but functionally different unit.

Compare time relay functions

These are functional categories for selection, rather than a claim that every function is available in every model. Confirm the selected unit’s operating diagram before ordering.

On-delay

Use an on-delay function when the output should change after a defined waiting period following its starting event. Typical uses include staged control commands and delayed enabling of an auxiliary circuit. Verify what happens if power or the signal disappears before the delay finishes.

Off-delay

Use an off-delay function when an output must remain active for a defined period after a stop event. Signal-controlled off-delay units generally keep their supply present during timing. A true power-off delay requires a device designed for that behavior; the two should not be substituted.

Interval / one-shot

Choose an interval function when you need an output active for a set duration following a starting event. Check whether the function begins on power-up or on a control signal, and whether another trigger extends, restarts or leaves the interval unchanged.

Repeat-cycle

Choose a cyclic function for repeated switching between active and inactive periods. Confirm whether the cycle starts with output ON or OFF. Check whether the two periods are independently adjustable or share one setting, and how a restart affects the next cycle.

Multifunction

A multifunction timer provides several selectable behaviors in one device. It can simplify stocking when the supported functions match your applications. Record the selected function and scale in the panel documentation, so maintenance staff can reproduce the intended sequence.

Star-delta timing

A dedicated star-delta timer coordinates timing outputs for a suitable starter arrangement. The transition interval, interlocking and contactor coordination remain part of the complete starter design. A generic on-delay timer is not automatically an equivalent replacement.

Choose a format your panel can support

DIN-rail format

Consider available rail space, terminal access and enclosure clearances. Compare dimensions with the complete installation, including adjacent components and wiring routes. Compact width is useful only when the unit can still be adjusted, identified and maintained.

Plug-in format

Check the socket type, pin arrangement, retaining accessories and orientation. Similar plug-in bodies can use different terminal assignments. Include the socket in your purchasing specification and verify the complete assembly before treating a timer as a drop-in replacement.

Display or rotary setting

A display can make settings easier to read, while rotary controls provide a direct adjustment method. Check setting resolution, locking features and the risk of accidental changes. Choose according to access, maintenance practices and the precision your process actually requires.

Specify the delay you need to achieve

Give your target delay and its acceptable tolerance, then select a range that supports practical adjustment around that value. A wide range does not necessarily mean that every setting can be entered with equal resolution. Separate setting accuracy from repeatability: one describes how close the actual delay is to the chosen setting, while the other describes variation across repeated operations.

Also check recovery time, minimum trigger duration and the behavior after an interrupted cycle. These details matter when your machine restarts quickly or an operator repeatedly presses a start button. Use the selected datasheet’s definitions when comparing values.

Match the whole control circuit

Supply conditions

Specify nominal voltage, AC frequency where applicable, DC polarity requirements and expected supply variation. Confirm that the timer’s operating range covers the real circuit conditions, including transients and the effect of shared control supplies.

Output contacts

Identify the required changeover, normally open or normally closed contacts and whether any outputs are instantaneous rather than timed. Confirm contact ratings for the utilization category, switching voltage and expected operating frequency.

Control input

Describe whether triggering comes from a dry contact, a switched voltage or another control device. Check the input’s compatibility with the source, including leakage current and minimum signal duration. Do not assume that every control input can be wired the same way.

Concept of time relays and contactors in an industrial automation cabinet

Timing for coordinated equipment

Use a time relay where a clear, limited timing task supports the wider control system. The relay handles the selected timing action; contactors, protective devices and the machine controller keep their own roles.

Start from your application

Ventilation run-on

Keep extraction or ventilation operating for a defined period after a control signal ends, where the system design calls for it. Verify the fan switching arrangement, continued timer supply and the required output state following power loss.

Machine sequencing

Introduce a delay between auxiliary control steps such as enabling a subsequent operation. Check all prerequisite signals and interlocks. A timing delay alone cannot confirm that a moving component has reached a safe or correct position.

Cyclic auxiliary operation

Create a defined repeating command for suitable auxiliary equipment. Confirm independent ON/OFF settings where needed, switching endurance and the permitted duty cycle of the controlled device. Review the process behavior if the timer stops mid-cycle.

A timer controls timing. The load still needs coordination.

Use an appropriately rated contactor or interface device when the timer output cannot switch the load directly. Inductive and electronic loads may present inrush or switching conditions that differ substantially from a resistive load. Choose suppression components according to the controlled device and the effect on its release time.

Keep overload protection, short-circuit protection and isolation within the complete circuit design. A general-purpose timer is not a substitute for a safety-rated control device. Have qualified personnel verify the selected product, protection and wiring against the application requirements.

Four steps to a clear time relay specification

01 / Describe the sequence

Write down the starting event, output behavior during timing and final state. Include interruption, reset and retrigger behavior. A short sequence description often reveals the required function more clearly than a product name.

02 / Define the circuit

List supply voltage, trigger source, contact arrangement and the actual switched load. Include whether the output controls a contactor coil or directly switches equipment. Add mounting format and available panel space.

03 / Verify the model

Compare the proposed datasheet and operating diagram with your sequence. Check tolerances, environment, recovery time and any socket or accessory requirements. Confirm model-specific documentation for your target market.

04 / Validate the setting

During commissioning, verify the measured delay and output transitions under the intended operating conditions. Record the function, range and setpoint. Repeat the check after a replacement or change to the control sequence.

Replacing an existing time relay?

Send the full part number, a clear front photograph and the original datasheet if available. Include the supply voltage and a description of the observed sequence. When the original model is unavailable, matching the time range and physical dimensions is only the beginning of an equivalence review.

Compare trigger logic, contact state at rest, timed versus instantaneous contacts, terminal allocation, reset behavior and accessories. Confirm the new device’s documentation before changing wiring. Treat a replacement as a controlled engineering change if the new unit behaves differently during startup or power interruption.

Make your enquiry easy to evaluate

Your operating requirements

Include the timing function, setpoint, tolerance, supply, trigger and load. A timing sketch can help describe the sequence, but it should be reviewed alongside the proposed product’s official operating diagram.

Your purchasing requirements

State quantity, delivery destination, desired documentation and any replacement reference. Request confirmation of the exact model and accessories offered before placing an order. Availability and commercial terms depend on the final specification.

Your documentation requirements

Ask for the current datasheet, installation instructions and any applicable model-specific declarations or certificates. A standards reference in a catalogue does not by itself prove third-party certification or acceptance in your intended application.

Check the operating diagram before the part number

Function names and letter codes differ between manufacturers. Compare the sequence shown in the operating diagram, especially the role of supply and signal inputs, rather than choosing by a short code alone. The manufacturer’s model documentation takes precedence over general category descriptions.

Read a manufacturer timing-function reference

Time relay questions, answered

What is the difference between on-delay and off-delay?

On-delay waits before its timed output changes after a starting event. Off-delay retains an output state for a period after a stopping event. The exact starting and stopping events depend on the selected operating diagram.

Does an off-delay relay need power during timing?

Many signal-controlled off-delay relays need a continuous supply. A unit designed for delay after supply removal uses a different arrangement. Check the model specification rather than assuming these functions are interchangeable.

Can a timer switch a motor directly?

Only if its output is specifically rated for the motor and switching conditions. Many applications use the timer to control a correctly selected contactor. Review the motor starting duty and protection as part of the complete circuit.

Can I use the same relay on AC and DC?

Only when the specified supply supports both. Some models have a broad AC/DC range; others require one supply type or a narrower voltage. Check the exact ordering code and terminal instructions.

What does multifunction mean?

It means the device supports multiple selectable timing functions. The selection is model-specific. Confirm the supported sequence, time scales and control-input requirements before choosing it for several different panels.

Is a timer relay the same as a time switch?

A time relay typically responds to a supply or signal event and a duration. A calendar time switch follows programmed clock times. Choose based on whether your task starts from an event or a schedule.

Installation & commissioning

Are similar terminal numbers interchangeable?

Do not assume they are. Use the official terminal diagram for each device and verify sockets and accessories. A similar enclosure or plug pattern does not establish electrical compatibility.

What happens after a power failure?

The result depends on the function and model. Some cycles reset, while others may retain information. Define the required restart state and check the selected product’s documentation before installation.

Can I change the delay while it is running?

Behavior differs by model. Some changes affect the current cycle; others take effect later. Follow the instructions and use a safe commissioning procedure to avoid an unexpected output change.

Why does the actual delay differ from the dial?

Possible reasons include the chosen range, setting accuracy, supply conditions and the way timing is measured. Compare measured behavior with the manufacturer’s limits rather than judging solely by dial position.

Does an indicator prove the output contact has switched?

An indicator describes the status defined by the manufacturer. It may indicate power, timing or output command. Confirm the actual contact state during commissioning using appropriate methods.

Is an ordinary timer suitable for a safety function?

A general-purpose timer should not be assumed suitable. Safety-related timing requires the appropriate architecture, validated components and risk assessment for the machine or process.

Ordering & documentation

Which information helps identify a replacement?

Provide the complete model reference, supply information, existing datasheet, mounting details and required sequence. Include whether you need the existing socket retained. Photographs support identification but do not replace electrical verification.

Can one multifunction timer cover all my panels?

Possibly, where its functions, supply, contacts and environment match each circuit. Record each panel’s settings and validate the result. Standardization should follow a compatibility review rather than lead it.

Which compliance documents should I request?

Request documents covering the exact offered model and target market. Confirm the scope of any declaration, report or certificate. Do not infer that every device in a family shares identical approvals.

Tell us what needs to happen — and when.

Share your sequence, supply voltage, required delay, output load and quantity with BDDKG. Include the existing part number if you are replacing a timer. Use these details to request a model proposal and the documentation needed for your technical review.

Contact BDDKG about time relays

Request a Quote

Ready to Work Together? Build a project with us!