SWITCHING & ISOLATION
Manual source selection for distribution boards, control panels and backup power applications. Discuss your load, installation and operating requirements with BDDKG.

Product-family illustration. Confirm the exact switching arrangement and model with our team.

Choose between two power sources through a manually operated changeover arrangement. Identify the required switching positions, poles and installation method before selecting a series.
For suitable I–0–II designs, the centre position disconnects both sources. Confirm the switching sequence, electrical ratings and installation requirements for the selected model.
Discuss Your ApplicationExplore construction and operating styles for your application. Availability and specifications are confirmed for the selected series.

Rotary handle operation for panel-based source selection. Confirm the contact diagram, mounting arrangement and operating positions.
Get Selection Support
Open construction for integration into an appropriate enclosure. Discuss pole configuration, load characteristics and operating access.
Get Selection Support
Coordinate the changeover device with your panel layout, available space, terminals and source connection requirements.
Get Selection SupportIllustrations show product families and application contexts; they do not establish model specifications.
Start with the details that determine the right switch for your system.
Identify the two sources, number of switched conductors and switching sequence. Confirm neutral switching requirements for the system.
Share voltage, frequency, operating current and load characteristics. The selected device must be suitable for the intended duty.
Check mounting, terminal space, enclosure requirements and handle access. Request the model-specific drawing.
A changeover switch selects between two sources supplying a common load. The device and switching arrangement depend on the system design.
A manual changeover switch is operated by a person. An automatic transfer switch uses a controller and operating mechanism to manage source transfer automatically.
Send voltage, load current, number of poles, source arrangement, mounting requirements and expected quantity. Include a single-line diagram where available.
Contact our team for available series-specific drawings and documents, and to discuss marking, packaging and samples.
Share your application, required specifications and quantity. Our team will review the details and coordinate suitable options.